Deliverables

– Deliverable AR6.3 from 31. Aug 2019 –

AR6.3 Final Annual Report

Download File (5.4 MB)

– Deliverable D4.3 from 30. Jun 2019 –

D4.3 MiEdge field trials integrated in 5G-Berlin Testbed toward Tokyo Olympic 20...

Download File (5.1 MB)

– Deliverable D1.4 from 30. Jun 2019 –

D1.4 Final report on joint EU/JP vision, business models and eco-system impact

Download File (2.9 MB)

– Deliverable D5.3 from 30. Jun 2019 –

D5.3 Final report on dissemination, standards, regulation and exploitation

Download File (2.3 MB)

ALL PUBLICATIONS

Type Journal/Event Name Date Download File
Deliverable AR6.3 AR6.3 Final Annual Report 2019-08-31 PDF (5.4 MB)
Deliverable D4.3 D4.3 MiEdge field trials integrated in 5G-Berlin Testbed toward Tokyo Olympic 2020 2019-06-30 PDF (5.1 MB)
Deliverable D1.4 D1.4 Final report on joint EU/JP vision, business models and eco-system impact 2019-06-30 PDF (2.9 MB)
Deliverable D5.3 D5.3 Final report on dissemination, standards, regulation and exploitation 2019-06-30 PDF (2.3 MB)
Deliverable D3.2 D3.2 Integration of mmWave edge cloud into 5G mobile networks 2019-02-28 PDF (2.5 MB)
Deliverable D3.3 D3.3 Context information management to create traffic map for mmWave edge cloud 2019-02-28 PDF (3.9 MB)
Deliverable D3.4 D3.4 User/application centric orchestration of mmWave edge cloud 2019-02-28 PDF (5.2 MB)
Deliverable D2.2 D2.2 Design of mmWave ultra broadband access for 5G 2018-12-31 PDF (3.5 MB)
Deliverable D4.2 D4.2 5G MiEdge test-bed integrating mmWave access, liquid RAN C-plane, and user/application centric orchestration 2018-12-31 PDF (6.8 MB)
Deliverable D2.4 D2.4 Method of site specific deployment of mmWave edge cloud 2018-08-31 PDF (3.5 MB)
Deliverable AR6.2 AR6.2 Second Annual Report 2018-08-31 PDF (6.0 MB)
Deliverable D2.3 D2.3 Design of mmWave antennas for 5G enabled stadium 2018-06-30 PDF (1.8 MB)
Deliverable D4.1 D4.1 Performance evaluation of 5G MiEdge based 5G cellular networks 2018-06-30 PDF (3.3 MB)
Deliverable D5.2 D5.2 Second report on dissemination, standards, regulation and exploitation plan 2018-06-30 PDF (2.3 MB)
Deliverable AR6.1 AR6.1 First Annual Report 2017-08-31 PDF (3.5 MB)
Deliverable D1.2 D1.2 Mid-term report on joint EU/JP vision, business models and eco-system impact 2017-06-30 PDF (4.4 MB)
Deliverable D5.1 D5.1 First report on dissemination, standards, regulation and exploitation plan 2017-06-30 PDF (2.7 MB)
Deliverable D1.1 D1.1 Use Cases and Scenario Definition 2017-03-31 PDF (4.1 MB)

© 20xx IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, in any current or future media, including reprinting/republishing this material for advertising or promotional purposes, creating new collective works, for resale or redistribution to servers or lists, or reuse of any copyrighted component of this work in other works.